TRIAL REPAIRS TO BIRNBECK TRESTLE SET M - APRIL 2010

A photoset taken by the Friends of the Old Pier Society

Trial repair works were carried out to trestle set 'M' in early 2010. This involved replacing the upper lattice traverse bracing set on this set of trestles and refinishing the upper leg sections. To enable access to the upper parts of the trestle scaffolding was hung from above and the head of the trestle to provide access to the working decks. The removal of corroded collars was achieved by burning out their equally corroded fixings. The completed set of upper lattice bracing and associated collar parts were replaced, along with the lower mounting plates for the now-mostly lost knee bracing. Grit blasting was carried out prior to the repainting of the entire area.

The work was carried out by Mann Williams, Consulting Civil and Structural Engineers, in association with Tema Engineering Ltd, Ferguson Mann Architects and Trevor Humphreys Associates, Chartered Quantity Surveyors. These efforts were supported by English Heritage, North Somerset Council, the Friends of the Old Pier Society and the RNLI. This endeavour was completed on 30 April 2010. All images on this page © Friends of the Old Pier Society 2010.

Birnbeck Repair Logo #01

Birnbeck Repair Image #001

Birnbeck Repair Image #002

Birnbeck Repair Image #003

Birnbeck Repair Image #004

Birnbeck Repair Image #005

Birnbeck Repair Image #006

Birnbeck Repair Image #007

Birnbeck Repair Image #008

Birnbeck Repair Image #009

Birnbeck Repair Image #010

Birnbeck Repair Image #011

Birnbeck Repair Image #012

Birnbeck Repair Image #013

Birnbeck Repair Image #014

Birnbeck Repair Image #015

Birnbeck Repair Image #016

Birnbeck Repair Image #017

Birnbeck Repair Image #018

Birnbeck Repair Image #019

Birnbeck Repair Image #020

Birnbeck Repair Image #021

Birnbeck Repair Image #022


Return to the Media page

Return to the Home page